|
|
 |
 |
 |
 |
|
Complete Turnkey Project
Al-Hada Military Hospital & Prince Sultan Hospital & Rehabilitation
Centre
520 Bed capacity with 150 Emergency Beds
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
Period 11-10-2000 to 31-05-2003
(Renewal) Value. 830,000,000 Saudi Riyal
Period 14-11-1997 to 10-10-2000 (Renewal) Value. 830,000,000 Saudi Riyal
Period 16-12-1994 to 13-11-1997 (Renewal) Value. 830,000,000 Saudi Riyal
Period 18-01-1992 to 15-12-1994 (Renewal) Value.1,038,000,000 Saudi Riyal |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical Equipment including
ICU, CCU, NICU ER, Operating Rooms, Laboratory (Haematology,
Bacteriology, Chemistry), Radiology (Lithotripsy, Ultrasound,
X-Ray), Medical Gas System, In-patient and Out-patient,
installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally at the manufacturer's designated facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Saud Al Babtain Cardiac Centre, Dammam
75 Beds facility, Specialty in Cardiology
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology (Lithotripsy, Ultrasound, X-Ray), Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally at the manufacturer's designated facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Prince Sultan Airbase Clinic & Surgical Centre Phases 1
Prince Sultan Airbase Clinic & Surgical Centre Phase 2
Al Kharj, Saudi Arabia
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology (Lithotripsy, Ultrasound, X-Ray), Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally at the manufacturer's designated facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
His Royal Highness
Prince Abdullah Bin Abdul Aziz Palace Clinic |
 |
 |
 |
 |
 |
| Value in Saudi Riyal |
| 7.5m |
|
 |
 |
 |
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology (Lithotripsy, Ultrasound, X-Ray), Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally at the manufacturer's designated facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Al-Noor Hospital, Makkah 500 Bed
Hera Hospital, Makkah 200 Bed
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology (Lithotripsy, Ultrasound, X-Ray), Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally at the manufacturer's designated facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Saudi Ministry of Health 12 Hospitals
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of Medical Equipment including
ICU, CCU, NICU ER, Operating Rooms, Medical Gas System,
In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and
biomedical engineers locally at the manufacturer's designated
facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Construction & Medical
Equipment Turnkey Project
Emergency Centre, Makkah - Phase 1 & Phase 2
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
Scope:This
was a Turnkey Project of designing, constructing and equipping
a hospital for Ministry of Defence. The Hospital was built
as per design and was handed over.
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment, Furniture, Medical Gas System, In-patient
and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and
biomedical engineers locally and at the manufacturer's
designated facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Accident & Emergency Riyadh Military Hospital
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment, Furniture, Medical Gas System, In-patient and
Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally and at the manufacturer's designated
facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Prince Mansour Military Hospital, Taif PHASE - 1
75 Bed Hospital
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology (Lithotripsy, Ultrasound, X-Ray), Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally and at the manufacturer's designated
facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Prince Mansour Military Hospital, Taif PHASE II
75 Bed Hospital
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology (Lithotripsy, Ultrasound, X-Ray), Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally and at the manufacturer's designated
facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Medical Equipment Turnkey Project
Prince Mansour Military Hospital, Taif PHASE III
75 Bed Hospital
|
 |
|
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
|
Procurement of Medical Equipment including
ICU, CCU, NICU ER, Operating Rooms, Radiology, Medical
Gas System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, doctors, technical staff and biomedical
engineers locally and at the manufacturer's designated
facility |
|
|
Warranty and maintenance for a period of one year |
|
 |
 |
Operation & Management
King Fahad Hospital, Jizan
500 Bed Hospital
|
 |
 |
 |
 |
 |
| Value in Saudi Riyal |
| 120m |
|
 |
 |
 |
 |
24-09-2002
to 06-12-2005 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Complete Operation, Management and maintenance including
recruiting and staffing of clinical and non-clinical services,
catering, housekeeping, laundry, dietary, communications,
transportation and vehicles workshop etc. according to
the Ministry of Health standards |
|
|
Provision of continuous management operation and maintenance
services for the project |
|
|
Provision of all medical, surgical and pharmaceutical
supplies and non-medical supplies |
|
|
Provision of a comprehensive maintenance and repair program
and the replacement of medical and non-medical equipment
and supplies in order to provide excellent and continuous
services |
|
|
Operation of Biomedical Engineering Department,
training to the end users engineers, doctors, locally and
internationally |
|
|
Training of local citizens to be able to
join the program. |
|
 |
 |
Operation & Management
Jubail General Hospital 150 Beds
Saud Bin Jalwi Hospital, Hufuf 100 Beds
|
 |
 |
 |
 |
 |
| Value in Saudi Riyal |
| 105m |
|
 |
 |
 |
 |
20-11-2002
to 18-10-2005 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
 |
|
|
Complete Operation, Management and maintenance including
recruiting and staffing of clinical and non-clinical services,
catering, housekeeping, laundry, dietary, communications,
transportation and vehicles workshop etc. according to
the Ministry of Health standards |
|
|
Provision of continuous management operation and maintenance
services for the project |
|
|
Provision of all medical, surgical and pharmaceutical
supplies and non-medical supplies |
|
|
Provision of a comprehensive maintenance and repair program
and the replacement of medical and non-medical equipment
and supplies in order to provide excellent and continuous
services |
|
|
Operation of Biomedical Engineering Department,
training to the end users engineers, doctors, locally and
internationally |
|
|
Training of local citizens to be able to
join the program. |
|
 |
 |
Operation & Management
King Khalid International Airport, Riyadh
Ministry of Defence & Aviation
|
 |
01-01-2002 to
31-12-2005
01-01-2005 to
31-12-2007 (Renewed)
 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
|
|
|
Complete Operation, Management and maintenance including
recruiting and staffing of clinical and non-clinical services,
catering, housekeeping, laundry, dietary, communications,
transportation and vehicles workshop etc. according to
the Ministry of Health standards |
|
|
Provision of continuous management operation and maintenance
services for the project |
|
|
Provision of all medical, surgical and pharmaceutical
supplies and non-medical supplies |
|
|
Provision of a comprehensive maintenance and repair program
and the replacement of medical and non-medical equipment
and supplies in order to provide excellent and continuous
services |
|
|
Operation of Biomedical Engineering Department,
training to the end users engineers, doctors, locally and
internationally |
|
 |
 |
Medical Equipment
Turnkey Project
Tobruk Hospital, Libya
800 Bed facility
|
 |
 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
|
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects and electromechanical
team on design issues |
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology, Medical Gas System, In/Out patient, installation,
commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, technical staff and
biomedical engineers locally and at the manufacturer's
designated facility |
|
|
Warranty and maintenance for a period of
one year |
|
 |
 |
Medical Equipment
Turnkey Project
9 Benghazi Hospital, Libya
1500 Beds multi-facility
|
 |
 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
|
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects
and electromechanical team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology Medical Gas System, In/Out patient, installation,
commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, technical staff and
biomedical engineers locally and at the manufacturer's
designated facility |
|
|
Warranty and maintenance for a period of
one year |
|
 |
 |
Medical Equipment
Turnkey Project
Derna Hospital, Libya
50 Beds facility
|
 |
 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
|
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects
and electromechanical team on design issues |
|
|
Procurement of Medical Equipment including
ICU, CCU, NICU ER, Operating Rooms, Radiology Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, technical staff and
biomedical engineers locally and at the manufacturer's
designated facility |
|
|
Warranty and maintenance for a period of
one year |
|
 |
 |
Medical Equipment
Turnkey Project
Infectious Diseases Centre (Aid Centre), Libya
|
 |
 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
|
|
|
Project Management and development of equipment database |
|
|
Preparing schedules of components (room by room requirements) |
|
|
Producing BOQ’s for equipment groups and identifying
equipment utility requirements |
|
|
Interfacing with the client, architects
and electromechanical team on design issues |
|
|
Procurement of complete range of Medical
Equipment including ICU, CCU, NICU ER, Operating Rooms,
Radiology (Lithotripsy, Ultrasound, X-Ray), Medical Gas
System, In-patient and Out-patient, installation, commissioning. |
|
|
Equipment relocation/transfer |
|
|
Training of end users, technical staff and
biomedical engineers locally and at the manufacturer's
designated facility |
|
|
Warranty and maintenance for a period of
one year |
|
 |
 |
Beirut Governmental
University Hospital (BGUH), Lebanon (Next Phase)
|
 |
 |
 |
 |
 |
| Value in Saudi Riyal |
| 1.5m |
|
 |
 |
 |
 |
 |
| Client
- Ministry of Defense (MODA) Saudi Arabia |
|
Scope:
|
|
Supply, installation of complete range of Medical Equipment
including Physiotherapy equipment, Biomedical Equipment
and House Keeping Equipment. |
|
|
Testing commissioning, training and final handing over |
|
|
On site training to the medical staff. |
|
 |
 |
|
|
 |


























 |
 |
|
| MODA
Emergency Center (New Project) |
 |
|
| Client -
Ministry of Defense (MODA) Saudi Arabia |
 |
| Turnkey - Design, Build and equipping. |
|
 |
 |
|
|
 |


|
|